NuScale small modular reactor: Difference between revisions

From Citizendium
Jump to navigation Jump to search
m (remove redundant link to parent)
(add link to NuScale Debacle article)
Line 30: Line 30:
== Cost ==
== Cost ==
Specs for a 500MWe plant:<br/>
Specs for a 500MWe plant:<br/>
'''Plant cost per KW (including building but not land, permits or licensing):'''<br/>
'''Plant cost per KW (including building but not land, permits or licensing):'''<ref name=Debacle/><br/>
'''Operating cost per KWh (including fuel and maintenance):'''<br/>
'''Operating cost per KWh (including fuel and maintenance):'''<br/>
'''Initial fuel load:'''<br/>
'''Initial fuel load:'''<br/>
Line 36: Line 36:


== Notes and References ==
== Notes and References ==
{{Reflist|2}}
{{Reflist|refs=
<ref name=Debacle>[https://jackdevanney.substack.com/p/the-nuscale-debacle The NuScale Debacle] Jack Devanney, Feb 2023.</ref>
}}

Revision as of 10:46, 19 April 2023

This article is developing and not approved.
Main Article
Discussion
Related Articles  [?]
Bibliography  [?]
External Links  [?]
Citable Version  [?]
 
This editable Main Article is under development and subject to a disclaimer.

The NuScale small modular reactor is a smaller version of a standard Pressurized Water Reactor (PWR). This article will address the issues raised in the parent article Nuclear power reconsidered. Information is from the company website,[1] factsheet,[2] and 2020 Status Report to the IAEA.[3]


Diagram and specifications for the reactor.

The NuScale Power Module (NPM) is a 250 megawatts thermal (MWt) integral pressurized water reactor (IPWR) that employs gravity-driven natural circulation of the primary coolant for both normal operation and shutdown mode. The NPM, including containment, is fully factory-built and shipped to the plant site by truck, rail, or barge.

Safety

Accidental overheating.
• In a station blackout condition, the NPM safely shuts down and self-cools indefinitely—with no operator action, AC/DC power, or additional water needed.
• The feedwater and steam exit valves will close in the event of an emergency situation, and a secondary set of valves will open to depressurize steam from the reactor core into the containment vessel surrounding the reactor.[4]
• Natural circulation for normal operation eliminates the need for large primary piping and reactor coolant pumps.
• Each NPM houses approximately 5 percent of the nuclear fuel of a conventional 1,000 MWe nuclear reactor.

Sabotage
• NPMs are submerged in a below-grade pool of water housed in a Seismic Category 1, aircraft impact resistant building that serves as the ultimate heat sink for core cooling.

Waste Management

Same as existing Pressurized Water Reactors.

Weapons Proliferation

Same as existing Pressurized Water Reactors.

Cost

Specs for a 500MWe plant:
Plant cost per KW (including building but not land, permits or licensing):[5]
Operating cost per KWh (including fuel and maintenance):
Initial fuel load:
Fuel consumption per day:

Notes and References