V-1000 (missile): Difference between revisions

From Citizendium
Jump to navigation Jump to search
imported>Howard C. Berkowitz
No edit summary
imported>Howard C. Berkowitz
No edit summary
Line 1: Line 1:
{{subpages}}
Primarily developed as an engineering test system with limited operational capability, the '''V-1000''' was the first Soviet [[anti-ballistic missile]] (ABM), succeeded by the [[A-35 (missile)]]. Development began in 1956, flight testing took place in the early 1960s, and it was officially retired in 1973.
Primarily developed as an engineering test system with limited operational capability, the '''V-1000''' was the first Soviet [[anti-ballistic missile]] (ABM), succeeded by the [[A-35 (missile)]]. Development began in 1956, flight testing took place in the early 1960s, and it was officially retired in 1973.


There is a good deal of confusion between this missile and a subsequent Soviet [[surface-to-air missile]], because [[NATO]] and the [[Defense Intelligence Agency]], for reasons never rationally explained, reused the '''SA-5''' designation. This was known as the '''SA-5 GRIFFON'''. The '''SA-5 GAMMON''', however, is the Soviet [[S-200 (missile)]].
There is a good deal of confusion between this missile and a subsequent Soviet [[surface-to-air missile]], because [[NATO]] and the [[Defense Intelligence Agency]], for reasons never rationally explained, reused the '''SA-5''' designation. This was known as the '''SA-5 GRIFFON'''. The '''SA-5 GAMMON''', however, is the Soviet [[S-200 (missile)]].

Revision as of 21:59, 2 February 2009

This article is developing and not approved.
Main Article
Discussion
Definition [?]
Related Articles  [?]
Bibliography  [?]
External Links  [?]
Citable Version  [?]
 
This editable Main Article is under development and subject to a disclaimer.

Primarily developed as an engineering test system with limited operational capability, the V-1000 was the first Soviet anti-ballistic missile (ABM), succeeded by the A-35 (missile). Development began in 1956, flight testing took place in the early 1960s, and it was officially retired in 1973.

There is a good deal of confusion between this missile and a subsequent Soviet surface-to-air missile, because NATO and the Defense Intelligence Agency, for reasons never rationally explained, reused the SA-5 designation. This was known as the SA-5 GRIFFON. The SA-5 GAMMON, however, is the Soviet S-200 (missile).