Light rail in Auckland: Difference between revisions

From Citizendium
Jump to navigation Jump to search
(rough work -- see talk)
({{subpages}})
 
(20 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{subpages}}
[[File:Auckland proposed rail network following CRL completion - updated 2022.png | thumb | proposed route as of 2022.]]
In 2015 [[Auckland, New Zealand]], considered building '''light rail''' lines to replace some of its most heavily used bus lines.<ref name=InternationalRailway2015-01-23/>  Many of these new light rail lines, if built, would echo [[Auckland's former tram system]].<ref name=3News2015-01-24/>
In 2015 [[Auckland, New Zealand]], considered building '''light rail''' lines to replace some of its most heavily used bus lines.<ref name=InternationalRailway2015-01-23/>  Many of these new light rail lines, if built, would echo [[Auckland's former tram system]].<ref name=3News2015-01-24/>


Line 11: Line 12:
''[[Stuff.nz]]'' quoted Auckland Transport officials who described how the study was considering the option of building light rail routes, with a dedicated right of way, and the option of building routes where rail vehicles shared the road with other vehicles, as with a traditional [[streetcar]] system.<ref name=Stuff2015-01-23/>  Officials projected that the maximum passenger capacity of a true light rail line would be 18,000 passengers per hour, while the maximum capacity of a system where vehicles shared the road with other vehicles would max out at 12,000 passengers per hour.  They said 2,500 passengers per hour was the practical maximum for a bus route.
''[[Stuff.nz]]'' quoted Auckland Transport officials who described how the study was considering the option of building light rail routes, with a dedicated right of way, and the option of building routes where rail vehicles shared the road with other vehicles, as with a traditional [[streetcar]] system.<ref name=Stuff2015-01-23/>  Officials projected that the maximum passenger capacity of a true light rail line would be 18,000 passengers per hour, while the maximum capacity of a system where vehicles shared the road with other vehicles would max out at 12,000 passengers per hour.  They said 2,500 passengers per hour was the practical maximum for a bus route.


A series of formal proposals were made
In the fall of 2023 [[Prime Minister of New Zealand|Prime Minister]] [[Christopher Luxon]] called the plan a ''"white elephant"'', and promised to terminate it within 100 days of taking office.<ref name=nzherald2023-10-19/><ref name=newshub2023-10-20/>


In 2023
Auckland's Mayor, various city councilors, and the Auckland Transport chief executive [[Dean Kimpton]] all voiced the opinion that light rail remained an option in Auckland, in spite of the Federal government's opposition.<ref name=rnz2023-11-30/>
==References==
{{Reflist|refs=


==rough work==
{{cite news     
| url        =  
| title      =  
| work       =  
| author      =  
| date        =
| page        =
| location    =
| isbn        =
| language    =
| trans-title =
| trans_title = 
| archiveurl  =
| archivedate =
| accessdate  = 2024-01-02
| url-status  = live
| quote      =
}}
</ref>


<ref name=3News2015-01-24/>


<ref name=1news2022-01-27/>
{{cite news     
| url        =
| title      =
| work        =
| author      =
| date        =
| page        =
| location    =
| isbn        =
| language    =
| trans-title =
| trans_title = 
| archiveurl  =
| archivedate =
| accessdate  = 2024-01-02
| url-status  = live
| quote      =
}}
</ref>


<ref name=NextCity2015-01-27/>


<ref name=NzHerald2015-01-25/>
{{cite news     
| url        =
| title      =
| work        =
| author      =
| date        =
| page        =
| location    =
| isbn        =
| language    =
| trans-title =
| trans_title = 
| archiveurl  =
| archivedate =
| accessdate  = 2024-01-02
| url-status  = live
| quote      =
}}
</ref>


<ref name=aucklandcouncil2023-03-15/>


<ref name=NZGovt1978494/>
{{cite news     
| url        =
| title      =
| work        =
| author      =
| date        =
| page        =
| location    =
| isbn        =
| language    =
| trans-title =
| trans_title = 
| archiveurl  =
| archivedate =
| accessdate  = 2024-01-02
| url-status  = live
| quote      =
}}
</ref>


<ref name=x>
{{Cite web|url=https://www.nzta.govt.nz/assets/projects/southwest-gateway/Southwest-Gateway-Airport-to-Botany-rapid-transit-poster.pdf|title=Southwest Gateway Airport to Botany Rapid Transit|last=|first=|date=|website=|url-status=live|archive-url=https://web.archive.org/web/20200328140426/https://www.nzta.govt.nz/assets/projects/southwest-gateway/Southwest-Gateway-Airport-to-Botany-rapid-transit-poster.pdf|archive-date=28 March 2020|access-date=}}</ref>


<ref name=x>
{{cite news     
{{Cite web|url=https://at.govt.nz/projects-roadworks/airport-to-botany-rapid-transit/|title=Airport to Botany Rapid Transit|access-date=28 March 2020|archive-date=1 April 2020|archive-url=https://web.archive.org/web/20200401233722/https://at.govt.nz/projects-roadworks/airport-to-botany-rapid-transit/|url-status=live}}</ref>
| url         =  
| title       =  
| work        =
| author      =
| date       =  
| page        =
| location    =
| isbn        =
| language    =
| trans-title =
| trans_title = 
| archiveurl  =
| archivedate =  
| accessdate  = 2024-01-02
| url-status = live
| quote      =
}}
</ref>


<ref name="Auckland Transport2018-05-9">
{{cite news| url=https://at.govt.nz/projects-roadworks/light-rail/| title=Auckland Transport Alignment Project 2018| publisher=Auckland Transport| accessdate=10 May 2018| archive-date=20 November 2017| archive-url=https://web.archive.org/web/20171120093628/https://at.govt.nz/projects-roadworks/light-rail/| url-status=dead}}</ref>


<ref name="MoT">
{{cite news    
{{cite news| url=https://www.transport.govt.nz/land/auckland/atap| title=Auckland Transport Alignment Project 2018| publisher=New Zealand Ministry of Transport/Te Manatu Waka| date=9 May 2018| accessdate=10 May 2018| url-status=live| archive-date=10 May 2018| archive-url=https://web.archive.org/web/20180510115340/https://www.transport.govt.nz/land/auckland/atap}}</ref>
| url         =  
| title       =
| work        =  
| author      =  
| date       =
| page        =
| location    =
| isbn        =
| language    =
| trans-title =
| trans_title = 
| archiveurl  =
| archivedate =  
| accessdate = 2024-01-02
| url-status = live
| quote      =  
}}
</ref>


<ref name="Stuff2018-05-09">
{{cite web|url=https://www.stuff.co.nz/national/politics/103750310/nz-super-fund-keen-to-build-and-operate-aucklands-light-rail|author=Cooke, Henry|accessdate=10 May 2018|title=NZ Super Fund keen to build and operate Auckland's light rail|date=9 May 2018|publisher=Stuff.co.nz|archive-date=10 May 2018|archive-url=https://web.archive.org/web/20180510115716/https://www.stuff.co.nz/national/politics/103750310/nz-super-fund-keen-to-build-and-operate-aucklands-light-rail|url-status=live}}</ref>


<ref name=x>
{{cite news     
{{cite web|url=https://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12202106|accessdate=25 August 2019|title=Trams could run under Queen St as part of Auckland's $6 billion light rail project|date=9 February 2019|publisher=[[New Zealand Herald]]|archive-date=24 August 2019|archive-url=https://web.archive.org/web/20190824210609/https://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12202106|url-status=live}}</ref>
| url         =
| title      =  
| work        =  
| author      =  
| date        =  
| page        =  
| location    =  
| isbn        =  
| language    =
| trans-title =  
| trans_title =
| archiveurl  =  
| archivedate =  
| accessdate  = 2024-01-02
| url-status = live
| quote      =
}}
</ref>


<ref name=x>
{{cite web|url=https://i.stuff.co.nz/auckland/114654542/auckland-light-rail-announcement-soon|title=Auckland Light Rail announcement 'soon'|website=Stuff.co.nz|date=1 August 2019|accessdate=1 August 2019|archive-date=1 August 2019|archive-url=https://web.archive.org/web/20190801162859/https://i.stuff.co.nz/auckland/114654542/auckland-light-rail-announcement-soon|url-status=live}}</ref>


<ref name=x>
{{cite news     
{{cite web|url=https://www.railjournal.com/passenger/light-rail/two-delivery-partners-shortlisted-for-auckland-light-rail/|title=Two delivery partners shortlisted for Auckland light rail|website=International Railway Journal|date=23 August 2019|accessdate=25 August 2019|archive-date=25 August 2019|archive-url=https://web.archive.org/web/20190825113727/https://www.railjournal.com/passenger/light-rail/two-delivery-partners-shortlisted-for-auckland-light-rail/|url-status=live}}</ref>  
| url         =  
| title       =
| work        =  
| author      =  
| date       =
| page        =
| location    =  
| isbn        =
| language    =  
| trans-title =
| trans_title = 
| archiveurl  =
| archivedate =  
| accessdate  = 2024-01-02
| url-status = live
| quote      =
}}
</ref>


<ref name=x>
{{cite web|url=https://i.stuff.co.nz/national/politics/117065848/what-do-we-know-about-the-two-light-rail-plans-and-is-the-super-funds-worth-waiting-for|title=What do we know about the two light rail plans, and is the Super Fund's worth waiting for|website=Stuff.co.nz|date=31 October 2019|accessdate=2 November 2019|archive-date=2 November 2019|archive-url=https://web.archive.org/web/20191102033053/https://i.stuff.co.nz/national/politics/117065848/what-do-we-know-about-the-two-light-rail-plans-and-is-the-super-funds-worth-waiting-for|url-status=live}}</ref>


<ref name=x>
{{cite news     
{{cite web|url=https://www.newsroom.co.nz/2019/10/24/875033/aucklands-light-rail-decision-housing-or-transport|title=Twyford's dilemma: housing or a fast trip to the airport?|website=www.newsroom.co.nz|date=24 October 2019|accessdate=2 November 2019|archive-date=24 October 2019|archive-url=https://web.archive.org/web/20191024210838/https://www.newsroom.co.nz/2019/10/24/875033/aucklands-light-rail-decision-housing-or-transport|url-status=live}}</ref>
| url         =  
| title       =
| work        =  
| author      =  
| date       =  
| page        =
| location    =
| isbn        =
| language    =  
| trans-title =
| trans_title = 
| archiveurl  =
| archivedate =  
| accessdate  = 2024-01-02
| url-status = live
| quote      =
}}
</ref>


<ref name=x>
<ref name=newshub2023-10-28>
{{cite news |last1=Coughlan |first1=Thomas |title=Government puts light rail 'on hold' |url=https://www.stuff.co.nz/national/300011411/government-puts-light-rail-on-hold |accessdate=13 May 2020 |work=stuff |date=13 May 2020 |archive-date=20 May 2020 |archive-url=https://web.archive.org/web/20200520130242/https://www.stuff.co.nz/national/300011411/government-puts-light-rail-on-hold |url-status=live }}</ref>
{{cite news |last1=Small |first1=Zane
| title       = $14 billion Auckland light rail bid gets green light, decision on second Waitemata Harbour crossing on 2023
| url         = https://www.newshub.co.nz/home/politics/2022/01/14-billion-auckland-light-rail-bid-gets-green-light-decision-on-second-waitemat-harbour-crossing-in-2023.html
| access-date = 2022-01-29
| work       = [[Newshub]]
| date       = 2022-01-28
| archive-url = https://web.archive.org/web/20220129202949/https://www.newshub.co.nz/home/politics/2022/01/14-billion-auckland-light-rail-bid-gets-green-light-decision-on-second-waitemat-harbour-crossing-in-2023.html
| archive-date= 2022-01-29
| url-status = live
}}
</ref>


<ref name=x>
<ref name=greaterauckland2020-06-24>
{{cite web|url=https://www.newsroom.co.nz/1247394/light-metro-not-light-rail|title='Light Metro', not 'Light Rail'|website=www.newsroom.co.nz|date=26 June 2020|accessdate=26 June 2020|archive-date=28 June 2020|archive-url=https://web.archive.org/web/20200628173203/https://www.newsroom.co.nz/1247394/light-metro-not-light-rail|url-status=live}}</ref>
{{Cite news
| url         = https://www.greaterauckland.org.nz/2020/06/25/light-rail-dies-but-light-metro-may-return/
| title       = Light Rail dies but Light Metro may return
|access-date  = 2020-06-26
| date       = 2020-06-24
| work        = [[Greater Auckland]]
| archive-date= 4 August 2020-08-04
| archive-url = https://web.archive.org/web/20200804052111/https://www.greaterauckland.org.nz/2020/06/25/light-rail-dies-but-light-metro-may-return/
| url-status = live
}}
</ref>


<ref name=x>
<ref name=stuff2020-05-20>
{{Cite web|date=2020-06-24|title=Light Rail dies but Light Metro may return|url=https://www.greaterauckland.org.nz/2020/06/25/light-rail-dies-but-light-metro-may-return/|access-date=2020-06-26|website=Greater Auckland|language=en-NZ|archive-date=4 August 2020|archive-url=https://web.archive.org/web/20200804052111/https://www.greaterauckland.org.nz/2020/06/25/light-rail-dies-but-light-metro-may-return/|url-status=live}}</ref>
{{cite news
| author = Thomas Coughlan
| title=Government puts light rail 'on hold'
| url=https://www.stuff.co.nz/national/300011411/government-puts-light-rail-on-hold |accessdate=13 May 2020  
| work=stuff
| date= 2020-05-13
| archive-date= 2020-05-20
| archive-url=https://web.archive.org/web/20200520130242/https://www.stuff.co.nz/national/300011411/government-puts-light-rail-on-hold
| url-status=live  
}}
</ref>


<ref name=stuff2022-01-28/>
<ref name=newsroom2020-06-26>
| url        = https://www.newsroom.co.nz/1247394/light-metro-not-light-rail
| title      = 'Light Metro', not 'Light Rail'
|website=www.newsroom.co.nz
| date        = 26 June 2020-06-20
| accessdate  = 26 June 2020
| archive-date=28 June 2020
| archive-url=https://web.archive.org/web/20200628173203/https://www.newsroom.co.nz/1247394/light-metro-not-light-rail
|url-status=live
}}
</ref>


<ref name=nzherald2023-10-19/>
{{cite news     
| url        =
| title      =
| work        =
| author      =
| date        =
| page        =
| location    =
| isbn        =
| language    =
| trans-title =
| trans_title = 
| archiveurl  =
| archivedate =
| accessdate  = 2024-01-02
| url-status  = live
| quote      =
}}
</ref>


<ref name=newshub2023-10-20/>
<ref name=stuff2019-10-31>
{{cite web
| url        = https://i.stuff.co.nz/national/politics/117065848/what-do-we-know-about-the-two-light-rail-plans-and-is-the-super-funds-worth-waiting-for
| title      = What do we know about the two light rail plans, and is the Super Fund's worth waiting for
|website=Stuff.co.nz
| date        = 2019-10-31
| accessdate  = 2019-11-02
| archive-date= 2019=11=-2
| archive-url = https://web.archive.org/web/20191102033053/https://i.stuff.co.nz/national/politics/117065848/what-do-we-know-about-the-two-light-rail-plans-and-is-the-super-funds-worth-waiting-for
| url-status  = live
}}
</ref>


<ref name=Rnz2022-01-28/>
<ref name=newsroom2019-10-24>
{{cite news     
| url        = https://www.newsroom.co.nz/2019/10/24/875033/aucklands-light-rail-decision-housing-or-transport
| title      = Twyford's dilemma: housing or a fast trip to the airport?
| work        = [[Newsroom NZ]]
| date        = 24 October 2019-10-24
| accessdate  = 2 November 2019-11-02
| archive-date = 2019-10-24
| archive-url = https://web.archive.org/web/20191024210838/https://www.newsroom.co.nz/2019/10/24/875033/aucklands-light-rail-decision-housing-or-transport
| url-status  =live
| quote      =
}}
</ref>


<ref name=x>
<ref name=stuff2019-08-01>
{{Cite web |last=Neilson |first=Michael |date=29 November 2023 |title=Christopher Luxon’s first Cabinet: Unveils Government’s 100-day plan, pressure to rein in Winston Peters |url=https://www.nzherald.co.nz/nz/politics/watch-live-christopher-luxon-faces-pressure-to-rein-in-winston-peters-as-he-fronts-first-post-cabinet-press-conference/KEQJSEU7YVDUBJDUEBZX6INU4Y/ |access-date=29 November 2023 |website=NZ Herald}}</ref>  
{{cite news
| url         = https://i.stuff.co.nz/auckland/114654542/auckland-light-rail-announcement-soon
| title      = Auckland Light Rail announcement 'soon'
|website=Stuff.co.nz
| date        = 2019-08-01
| accessdate  = 2019-08-01
| archive-date= 2019-08-01
| archive-url = https://web.archive.org/web/20190801162859/https://i.stuff.co.nz/auckland/114654542/auckland-light-rail-announcement-soon
| url-status  = live
| quote      =  
}}
</ref>


<ref name=x>
<ref name=railjournal2019-08-24>
{{Cite web |last=Williams |first=Amy |date=30 November 2023 |title=Auckland Light Rail: New government taking advice after stopping work on project |url=https://www.rnz.co.nz/news/national/503560/auckland-light-rail-new-government-taking-advice-after-stopping-work-on-project |access-date=30 November 2023 |website=RNZ}}</ref>
{{cite news     
| url        = https://www.railjournal.com/passenger/light-rail/two-delivery-partners-shortlisted-for-auckland-light-rail/
| title      = Two delivery partners shortlisted for Auckland light rail|website=
| work        = [[International Railway Journal]]
| author      =  
| date       = 2019-08-23
| page        =
| location    =
| isbn        =  
| language    =
| trans-title =  
| trans_title = 
| accessdate  = 2019-08-25
| archive-date= 2019-08-25
| archive-url = https://web.archive.org/web/20190825113727/https://www.railjournal.com/passenger/light-rail/two-delivery-partners-shortlisted-for-auckland-light-rail/
| url-status  = live
| quote      =  
}}
</ref>


<ref name="Newshub 28 Jan 2022">
<ref name=NZGovtSouthwestGateway>
{{cite news |last1=Small |first1=Zane |title=$14 billion Auckland light rail bid gets green light, decision on second Waitemata Harbour crossing on 2023 |url=https://www.newshub.co.nz/home/politics/2022/01/14-billion-auckland-light-rail-bid-gets-green-light-decision-on-second-waitemat-harbour-crossing-in-2023.html |access-date=29 January 2022 |work=[[Newshub]] |date=28 January 2022 |archive-url=https://web.archive.org/web/20220129202949/https://www.newshub.co.nz/home/politics/2022/01/14-billion-auckland-light-rail-bid-gets-green-light-decision-on-second-waitemat-harbour-crossing-in-2023.html |archive-date=29 January 2022|url-status=live}}</ref>
{{Cite web
| url         = https://www.nzta.govt.nz/assets/projects/southwest-gateway/Southwest-Gateway-Airport-to-Botany-rapid-transit-poster.pdf
| title      = Southwest Gateway Airport to Botany Rapid Transit
| url-status  = live
| archive-url = https://web.archive.org/web/20200328140426/https://www.nzta.govt.nz/assets/projects/southwest-gateway/Southwest-Gateway-Airport-to-Botany-rapid-transit-poster.pdf
| archive-date= 2020-03-28
}}
</ref>


<ref name="RNZ 28 Jan 2022"/>
<ref name=Stuff2018-05-09>
{{cite news
| url        = https://www.stuff.co.nz/national/politics/103750310/nz-super-fund-keen-to-build-and-operate-aucklands-light-rail
| author    = Henry Cooke
| accessdate = 10 May 2018-05-10
| title      = NZ Super Fund keen to build and operate Auckland's light rail
| date      = 9 May 2018-05-09
| work        = [[Stuff (website)|Stuff]]
| archive-date= 2018-05-10
| archive-url=https://web.archive.org/web/20180510115716/https://www.stuff.co.nz/national/politics/103750310/nz-super-fund-keen-to-build-and-operate-aucklands-light-rail
| url-status  = live
}}
</ref>


*{{cite news|url= http://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12030342| title= Auckland has a better option for Airport rapid transit| work=[[The New Zealand Herald]]| author= Boswell, Ross| date= 12 April 2018}}
<ref name=nzherald2019-08-24>
*{{cite news|url= https://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12048159| author= Davison, Isaac | title= Auckland's new rail lines could be ready within six years, but only if Labour is still in power| work=[[The New Zealand Herald]]| date= 10 May 2018 }}
{{cite news
*{{cite news|url= http://www.nzherald.co.nz/business-video/news/video.cfm?c_id=1503079&gal_cid=1503079&gallery_id=190565
| url       = https://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12202106
| title= French tram bid plan – An Alstom executive in Reims tells of his plans for Auckland trams| work=[[The New Zealand Herald]]| date= 31 March 2018}}
| title     = Trams could run under Queen St as part of Auckland's $6 billion light rail project
*{{cite news|url= http://www.nzherald.co.nz/business/news/article.cfm?c_id=3&objectid=12017783| title= Auckland tram project to start in two years: Twyford| work=[[The New Zealand Herald]]| author=Gibson, Anne| date= 31 March 2018}}
| accessdate = 25 August 2019
*{{cite news|url= https://www.nzherald.co.nz/business/news/article.cfm?c_id=3&objectid=12047847| title= How big tram projects can be derailed: Aussie example shows the risks| work=[[The New Zealand Herald]]| author=  Gibson, Anne| date= 9 May 2018| accessdate= 11 May 2018}}
| date       = 9 February 2019-02-09
*{{cite news|url= https://www.stuff.co.nz/auckland/103389024/auckland-council-government-commits-48b-towards-auckland-transportation-infrastructure| title= Auckland Council, Government commit $28b towards Auckland transportation infrastructure|publisher=[[Stuff (website)|Stuff]]| author= Jacobson, Adam| date= 26 April 2018}}
| work       = [[New Zealand Herald]]
*{{cite news|url= https://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12042426| title= Trams to the airport is deluded folly| author= Lee, Mike| work=[[The New Zealand Herald]]| date= 1 May 2018 }}
| archive-date=24 August 2019-08-24
*{{cite news|url= http://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12038096| title= Light rail not really about airport| work=[[The New Zealand Herald]]| author= Lowrie, Matt| date= 24 April 2018}}
| archive-url= https://web.archive.org/web/20190824210609/https://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12202106
*{{cite news|url= http://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12031322| title= Experts say trams won't be running in Auckland until 2025| work=[[The New Zealand Herald]]| author= Orsman, Bernard| date= 13 April 2018}}
| url-status  = live
*{{cite news|url= https://www.stuff.co.nz/auckland/103402210/what-you-need-to-know-about-the-28b-auckland-transport-alignment-project| title= What you need to know about the $28b Auckland Transport Alignment Project|publisher=[[Stuff (website)|Stuff]]| date= 26 April 2018}}
}}
*{{cite news|url= http://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12040240| title= In praise of joined-up transport thinking| author= Wilson, Simon | work=[[The New Zealand Herald]]| date= 27 April 2018 }}
</ref>
*{{cite news|url= https://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12047478| title= NZ Super Fund wants to own and operate two of Auckland's light rail projects| work=[[The New Zealand Herald]]| author= Wilson, Simon| date= 9 May 2018| accessdate= 9 May 2018}}
*{{cite news|url= https://www.nzherald.co.nz/business/news/article.cfm?c_id=3&objectid=12048269| title= Business should be salivating over new light rail lines| author= Wilson, Simon | work=[[The New Zealand Herald]]| date= 10 May 2018}}
{{Public transport in Auckland}}
 
==References==
{{Reflist|refs=


{{cite news       
{{cite news       
Line 126: Line 396:
</ref>
</ref>


<ref name=NZGovt1978494/>
<ref name=nzherald2023-11-29>
{{Cite news
| url        = https://www.nzherald.co.nz/nz/politics/watch-live-christopher-luxon-faces-pressure-to-rein-in-winston-peters-as-he-fronts-first-post-cabinet-press-conference/KEQJSEU7YVDUBJDUEBZX6INU4Y/
| title      = Christopher Luxon’s first Cabinet: Unveils Government’s 100-day plan, pressure to rein in Winston Peters
| author      = Michael Neilson
| date        = 2023-11-29
| access-date = 2023-11-29
| work        = [[NZ Herald]]
}}
</ref>
 
<ref name=rnz2023-11-30>
{{Cite news
| author      = Amy Williams
| date        = 2023-11-30
| title      = Auckland Light Rail: New government taking advice after stopping work on project
| url        = https://www.rnz.co.nz/news/national/503560/auckland-light-rail-new-government-taking-advice-after-stopping-work-on-project
| access-date = 2023-11-30
| work        = [[Radio New Zealand]]
}}
</ref>


<ref name=nzherald2023-10-19/>
<ref name=NZGovtAirport2Botany>
{{Cite web
| url        = https://at.govt.nz/projects-roadworks/airport-to-botany-rapid-transit/
| title      = Airport to Botany Rapid Transit
| access-date = 2020-03-28
| archive-date= 2020-04-01
| archive-url =https://web.archive.org/web/20200401233722/https://at.govt.nz/projects-roadworks/airport-to-botany-rapid-transit/
| url-status  = live
}}
</ref>


<ref name=aucklandcouncil2023-03-15/>
<ref name=AucklandTransport2018-05-09>
{{cite web
| url        = https://at.govt.nz/projects-roadworks/light-rail/
| title      = Auckland Transport Alignment Project 2018
| publisher  = [[Auckland Transport]]
| accessdate  = 2018-05-10
| archive-date= 2017-11-20
| archive-url=https://web.archive.org/web/20171120093628/https://at.govt.nz/projects-roadworks/light-rail/
| url-status  =dead
}}
</ref>


<ref name=Rnz2022-01-28/>
<ref name=MoT2018-05-09>
{{cite web
| url        = https://www.transport.govt.nz/land/auckland/atap
| title      = Auckland Transport Alignment Project 2018
| publisher  = [[New Zealand Ministry of Transport]] / Te Manatu Waka
| date        = 2018-05-09
| accessdate  = 2018-05-10
| url-status  = live
| archive-date=10 May 2018
| archive-url = https://web.archive.org/web/20180510115340/https://www.transport.govt.nz/land/auckland/atap
}}
</ref>


<ref name=1news2022-01-27/>
{{cite news     
| url        =
| title      =
| work        =
| author      =
| date        =
| page        =
| location    =
| isbn        =
| language    =
| trans-title =
| trans_title = 
| archiveurl  =
| archivedate =
| accessdate  = 2024-01-02
| url-status  = live
| quote      =
}}
</ref>


<ref name=stuff2022-01-28>
<ref name=stuff2022-01-28>
Line 298: Line 636:
| author      = Raphael Franks
| author      = Raphael Franks
| date        = 2023-10-19
| date        = 2023-10-19
| page        =
| location    =  
| location    =  
| isbn        =
| archiveurl  = https://web.archive.org/web/20231030225553/https://www.nzherald.co.nz/nz/election-2023-prime-minister-elect-christopher-luxon-pays-visit-to-his-botany-electorate/XK7MBUHAWJHIJHU72LLCT5HURQ/
| language    =
| archivedate = 2023-10-30
| trans-title =
| trans_title =
| archiveurl  =  
| archivedate =  
| access-date = 2023-10-19
| access-date = 2023-10-19
| url-status  = live
| url-status  = live
| quote      =  
| quote      = He told the media National plans to cancel light rail because it’s a {{'}}white elephant{{'}}.
}}
}}
</ref>
</ref>

Latest revision as of 17:39, 2 January 2024

This article is a stub and thus not approved.
Main Article
Discussion
Related Articles  [?]
Bibliography  [?]
External Links  [?]
Citable Version  [?]
 
This editable Main Article is under development and subject to a disclaimer.
proposed route as of 2022.

In 2015 Auckland, New Zealand, considered building light rail lines to replace some of its most heavily used bus lines.[1] Many of these new light rail lines, if built, would echo Auckland's former tram system.[2]

Auckland was served by a network of traditional tram or streetcar routes until the mid-20th Century.[3][4] The original tram network had 72 km (44.74 mi) of track.[5]

Steve Hawkins, Auckland Transport's Chief Engineer, said that the bus routes on Symonds Street and Fanshawe Street require as many as 150 buses each.[6] The Light Rail study is considering replacing the bus routes on Dominion Road, Manukau Road, Mt Eden Road, Symonds Street and Queen St with light rail routes. All of those bus routes replaced routes on Auckland's 20th Century Tram network.

Auckland Mayor Len Brown pointed out that the city's ten year plan did not include funding for building new light rail routes.[6]

Stuff.nz quoted Auckland Transport officials who described how the study was considering the option of building light rail routes, with a dedicated right of way, and the option of building routes where rail vehicles shared the road with other vehicles, as with a traditional streetcar system.[6] Officials projected that the maximum passenger capacity of a true light rail line would be 18,000 passengers per hour, while the maximum capacity of a system where vehicles shared the road with other vehicles would max out at 12,000 passengers per hour. They said 2,500 passengers per hour was the practical maximum for a bus route.

In the fall of 2023 Prime Minister Christopher Luxon called the plan a "white elephant", and promised to terminate it within 100 days of taking office.[7][8]

Auckland's Mayor, various city councilors, and the Auckland Transport chief executive Dean Kimpton all voiced the opinion that light rail remained an option in Auckland, in spite of the Federal government's opposition.[9]

References

  1. Keith Barrett. Auckland to launch light rail study, International Railway Journal, 2015-01-23. Retrieved on 2015-01-27. “THE board of Auckland Transport has called for studies to be carried out into the construction of a light rail network in New Zealand's largest city.”
  2. Light rail gets thumbs up from opposition, 3 News, 2015-01-24. Retrieved on 2024-01-02. “Auckland Transport says it's investigating whether light rail on Queen St, Symonds St, Sandringham Rd, Dominion Rd, Mt Eden Rd and Manukau Rd is a good alternative to buses. Most of those routes had trams running on them before they were removed in the 1950s.”
  3. Sandy Smith. Beijing to Add Four More Metro Lines, Next City, 2015-01-27. Retrieved on 2015-01-27. “The transportation agency in New Zealand’s largest city, Auckland, is taking the first steps toward returning trams to a number of city streets that last saw them in the 1950s.”
  4. Wayne Thompson. From apps to zones: Is this how we get city moving?, New Zealand Herald, 2015-01-25. Retrieved on 2015-01-27. “Auckland Transport has also pitched light rail for some highly congested bus routes. Light rail, or trams, on a priority path could shift 18,000 people an hour compared with a bus on a shared path shifting 2500 people and a bus on a priority path's 6000 people an hour.”
  5. Mathew Dearnaley. Light rail returns to the spotlight, New Zealand Herald, 2015-01-23. Retrieved on 2015-01-28. “The city's transport authority has revealed it is investigating replacing buses with electric light rail on a handful of busy isthmus routes such as Symonds St, Mt Eden Rd, Dominion Rd and Sandringham Rd - all part of a 72km tram network before their tracks were ripped up in 1956.”
  6. 6.0 6.1 6.2 Maria Slade. Len Brown cool on light rail in Auckland transport plan, Stuff, 2015-01-23. Retrieved on 2015-01-28. “Auckland Transport (AT) says bus routes in the central city and along main roads such as Dominion Road and Manukau Road are at near capacity, and light rail is the most practical solution.”
  7. Raphael Franks. Election 2023: Prime Minister-elect Christopher Luxon pays visit to his Botany electorate, New Zealand Herald, 2023-10-19. “He told the media National plans to cancel light rail because it’s a 'white elephant'.”
  8. Adam Hollingworth. Incoming Prime Minister Christopher Luxon to scrap Light Rail, Auckland mayor suggests cheaper option, 2023-10-20. Retrieved on 2024-01-02.
  9. Amy Williams. Auckland Light Rail: New government taking advice after stopping work on project, Radio New Zealand, 2023-11-30.

Cite error: <ref> tag with name "newshub2023-10-28" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "greaterauckland2020-06-24" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "stuff2020-05-20" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "newsroom2020-06-26" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "stuff2019-10-31" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "newsroom2019-10-24" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "stuff2019-08-01" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "railjournal2019-08-24" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "NZGovtSouthwestGateway" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "Stuff2018-05-09" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "nzherald2019-08-24" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "nzherald2023-11-29" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "NZGovtAirport2Botany" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "AucklandTransport2018-05-09" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "MoT2018-05-09" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "stuff2022-01-28" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "NZGovt1978494" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "aucklandcouncil2023-03-15" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "Rnz2022-01-28" defined in <references> is not used in prior text.

Cite error: <ref> tag with name "1news2022-01-27" defined in <references> is not used in prior text.